July 1, 2026
From this date, every 2.5-3.5 t van in international commercial transport must have a digital tachograph.
ONYX and DBK partner offer
From July 1, 2026, vans with GVW 2.5-3.5 t in international transport must have a tachograph. Prepare your fleet.
The key changes that affect van fleet owners
From this date, every 2.5-3.5 t van in international commercial transport must have a digital tachograph.
Van drivers follow the same rules as truck drivers. Driving time, breaks and rest periods must be recorded.
Missing tachograph or missing legalisation can result in major financial penalties and possible loss of transport license.
After 4.5h of driving, a mandatory 45 min break. Weekly max 56h, and 90h across two weeks.
Before you start planning, learn the key terms

A device installed in the vehicle that records driving time, breaks and driver rest periods.
We install VDO tachographs at authorised DBK service points.
A GPS system that tracks vehicle position and route performance.
Our plug&play solution can be installed in about 5 minutes.



A transport management system.
Plan routes, send instructions to driver tablets, and track ETA for every stage of the trip.

Digital data from tachographs required during inspections.
With telematics you can download them remotely, without visiting the vehicle.
The same rules truck drivers already know
Driving time
max. 9h / day
2x per week up to 10h
Week
56h / 90h
Weekly / two-week period
Break
45 min after 4.5h
Can be split: 15 + 30 min
Rest
min. 11h / day
3x per week can be reduced to 9h
Monthly price per vehicle. No hidden costs.
Tachograph installation: one-time fee
Installation cost depends on vehicle brand. Contact us for pricing. Packages below apply to remote download and telematics.
Remote tachograph data download and GPS monitoring.
This is only about ~2.30 PLN per day
Main features
Full fleet control with a transport management system.
This is only about ~3.30 PLN per day
Everything from the base package, plus
Important information about installation deadlines
The closer to July 2026, the longer service queues become. Book installation now to avoid fleet downtime and potential penalties caused by delays.
Have a different vehicle? Contact us and we will check installation options.
MB Sprinter
VW Crafter
Renault Master
Opel Movano
Iveco Daily
The closer to July, the longer the queues
Day 1
Tell us how many vehicles you have. We prepare an offer and implementation timeline.
April / May
We install wiring and sensors at a DBK point. The vehicle returns to work immediately.
June
A few days before July 1, we install the tachograph during a short DBK appointment.
July 1
From July 1, you operate in compliance. Telematics and tachograph work together.
Install your tachograph at an authorised DBK service point
In practice, it applies to international transport performed by vans with GVW 2.5-3.5 t.
If needed, we can verify your exact case (country, transport type, business profile) and advise what to implement.
Yes. Under the ONYX and DBK partner offer, we organise installation at a DBK point and baseline fleet configuration.
Most often, installation and handover are completed within one service appointment.
Click "Free quote" and we will return with available dates and the information needed for pricing.
Not always, but in practice telematics makes fleet control, planning and reporting much easier.
We can propose a "tachograph + telematics" package matched to your scale and routes.
Subscription starts at 69 PLN - final pricing depends on fleet size and scope (tachograph, telematics, support).